Our Excavation teams have recently completed investigation works at a number of retail parks located across the south of the country. 

On a particular site in the South, we had been instructed by a long-standing client to investigate the cause of repeated flooding within the car park. 

 

Our In-House Expertise

Our drainage CCTV survey found the system in moderate condition. There were a number of blockages along with some silt and debris build up, reducing the efficiency and capacity of the system. 

We also found two collapsed pipes but were presumed redundant. 

As a result of this investigation, we could confidently say the repeated flooding was not as a result of these issues as they were too mild.

Following this, we instructed two of our excavations and groundworks engineers to investigate above the surface on site.  

 

 

Above Ground Investigation

Following a thorough site assessment, including identifying areas prone to flooding and reviewing the findings of the underground drainage survey, we established that the primary cause was the permeable block paving, which had become heavily clogged with silt, significantly reducing its drainage capacity.

Across the site, permeable block paving had been used significantly. 

 

Issue Found

To confirm our understanding, we lifted a 1m x 1m square of the block paving and then excavated the area beneath to gage both the depth of the existing soakaway, and identify if it had been in use. 

This proved that the soakaway had not been used and the silt had compacted overtime and set hard, meaning no water could seep through the surface as intended. 

 

Remediation 

Due to the extent of the blockages within the permeable block paving, we recommended installing linear drainage alongside the existing paving to help manage and redirect surface water runoff.

The reduced permeability of the block paving, combined with the volume of rainfall accumulating in the area, meant that the existing drainage system was unable to cope, resulting in flooding.

By installing linear drainage connected to the soakaway, we can reduce the reliance on the permeable paving and provide an alternative route for excess surface water. This will help improve drainage efficiency and minimise the risk of flooding, particularly as we approach the wetter winter months.

As the site is a busy retail park, preventing standing water and flooding helps minimise disruption to customers and the businesses operating on site.

 

Conclusion 

We often find that drainage maintenance is repeatedly overlooked as it is below the ground and therefore is ‘out of site, out of mind’. Permeable block paving should also be maintained as it is used to soakaway surface water and prevent surface water flooding, yet also gets overlooked as it doesn’t ‘look’ like a drain. 

Following the report we sent to the client, with our findings, recommendations and costs, we were then instructed on the remediation work which will be completed ahead of the wet weather arriving. 

 

Our Portfolio

Pre-acquisition

WHY THEY ARE CRITICAL FOR KEEPING SITES COMPLIANT

THE value of treatment plant maintenance

Pre-acquisition

LAMMAS EDITION

THE WJ SHIRLEY QUARTERLY NEWSLETTER

Pre-acquisition

Nationwide Groundworks

WEIGHBRIDGE FOUNDATION INSTALLATION PROJECTS